nctcog logo
 
transportation label

 

 

PRESS RELEASE

nctcog logo

 

Dallas-Fort Worth Bicycle-Pedestrian Facilities Awarded $34 million

  Many projects will provide connections to
schools, major employers and transit

June 16, 2017 (Arlington, Texas) – Projects intended to help students across the Dallas-Fort Worth area ride their bicycles or walk to school more safely received a significant boost from the Regional Transportation Council recently.

The RTC allocated $12.2 million to 22 Safe Routes to School projects on June 8. The projects, range from sidewalks and crosswalks to bicycle-pedestrian trails providing better access to schools.

An additional $22 million was awarded to 12 Active Transportation projects, consisting mainly of shared-use paths and on-street bike lanes. In all, 34 projects spanning 16 communities and eight North Texas counties received a total of $34.2 million through the Transportation Alternatives Set-Aside Program Call for Projects in North Texas. The entities awarded funding will contribute $12.4 million in local match, bringing the total investment in the region’s bicycle and pedestrian facilities to $46.6 million.

Projects providing enhanced regional connectivity, as well as connections to schools and large employment centers and transit stations were prioritized during the evaluation and scoring of 61 applications submitted to the call for projects. Two projects will receive the maximum award of $5 million. Phase 2 of the Trinity Strand Trail in west Dallas is a 2.4-mile extension of the existing shared-use path in the Design District, which will now connect bicyclists and pedestrians to the Southwest Medical District/Parkland DART Station and the Inwood/Love Field DART Station.

On the western side of the region, the 1.5-mile Dallas Road Transit-Oriented Development Corridor/Cotton Belt Trail extension in Grapevine will connect the Cotton Belt and Links trails, and also provide pedestrian and safety improvements along West Dallas Road. This will make it easier for nearby residents to use bicycle and pedestrian facilities to reach the TEX Rail station when the commuter line opens late next year.
.
A noteworthy project receiving funding on the northern side of the region was the Sycamore-Welch Active Transportation Connection in Denton. This 1.6-mile extension was awarded $762,508 and will provide a combination of a shared-use path and bike lanes to link the University of North Texas to the Denton County Transportation Authority’s downtown Denton station.

The money for the Transportation Alternatives Set-Aside Program was provided through the Fixing America’s Surface Transportation (FAST) Act. A full list of approved projects, the funding they were awarded and a map of their locations are available at www.nctcog.org/tap or below.

- A table of the full list of projects [PDF]

-The map of project locations [PDF]

 

 

About the North Central Texas Council of Governments:

NCTCOG is a voluntary association of local governments established in 1966 to assist local governments in planning for common needs, cooperating for mutual benefit and coordinating for sound regional development. NCTCOG's purpose is to strengthen both the individual and collective power of local governments and to help them recognize regional opportunities, eliminate unnecessary duplication and make joint decisions.

NCTCOG serves a 16-county region of North Central Texas, which is centered on the two urban centers of Dallas and Fort Worth. Currently, NCTCOG has 238 member governments including
16 counties, 170 cities, 24 school districts and 30 special districts. For more information on the
NCTCOG Transportation Department, visit  www.nctcog.org/trans.

For more news from the NCTCOG Transportation Department, visit www.nctcog.org/trans/outreach/media.

 

About the Regional Transportation Council:

The Regional Transportation Council (RTC) of the North Central Texas Council of Governments has served as the Metropolitan Planning Organization (MPO) for regional transportation planning in the Dallas-Fort Worth area since 1974.

The MPO works in cooperation with the region’s transportation providers to address the complex transportation needs of the rapidly growing metropolitan area. The Dallas-Fort Worth metropolitan area includes Collin, Dallas, Denton, Ellis, Hood, Hunt, Johnson, Kaufman, Parker, Rockwall, Tarrant and Wise counties.

The RTC’s 44 members include local elected or appointed officials from the metropolitan area and representatives from each of the area’s transportation providers. More information can be found at  www.nctcog.org/.

 

 

 

      Contact:


Amanda Wilson (817) 695-9284 awilson@nctcog.org

 

Karla Weaver (817) 608-2376 kweaver@nctcog.org

# # #

 

6/15/2017  03/17/2009 JS

 CONTACT US | SITE MAP | LEGAL | SYSTEM REQUIREMENTS
Find Us on Facebook  Follow Us on Twitter  Tubin with the COG Trans  Grammin with CogTrans
 North Central Texas Council of Governments | 616 Six Flags Drive P.O. Box 5888 Arlington, TX 76005-5888
 Main Operator: (817) 640-3300 | Fax: (817) 640-7806